Assessment Year | 2012 |
---|---|
Principal Product | Corrugated Boxes and Point of Purchase Displays |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 36 |
Plant Area |
250,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,474 | 2,631,584 |
kWh
|
$0.053 |
Electricity Demand | $49,001 | 7,773 |
kW-mo/yr
|
$6.30 |
Natural Gas | $342,679 | 40,458 |
MMBtu
|
$8.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,036 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,127 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $18,760 | $150 |
$18,760
353,964
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,173 | $1,000 |
$6,751
127,370
kWh
|
$2,422
-
kW-mo/yr
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,242 | $16,000 | - | - |
$6,242
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,734 | $8,000 |
$5,693
107,416
kWh
|
$2,041
-
kW-mo/yr
|
- | |
05 | 2.3134: Shift from daytime to nighttime operation | $6,810 | $368 | - |
$6,810
-
kW-mo/yr
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,840 | $3,000 | - |
$2,840
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,762 | $25 |
$2,008
37,885
kWh
|
$754
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,616 | $650 |
$1,931
36,432
kWh
|
$685
-
kW-mo/yr
|
- | |
09 | 2.4112: Install soft-start to eliminate nuisance trips | $2,523 | $2,500 | - |
$2,523
-
kW-mo/yr
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $576 | $840 |
$424
8,004
kWh
|
$152
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $60,036 | $32,533 |
$35,567
671,071
kWh
|
$18,227
-
kW-mo/yr
|
$6,242
-
MMBtu
|
||
TOTAL IMPLEMENTED | $50,127 | $28,825 |
$35,143
663,067
kWh
|
$8,742
-
kW-mo/yr
|
$6,242
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs