Assessment Year | 2012 |
---|---|
Principal Product | Plugs |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $10 M to 50M |
# of Employees | 36 |
Plant Area |
40,000
ft2
|
Annual Production | 190,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,118 | 700,000 |
kWh
|
$0.086 |
Electricity Demand | $8,597 | 1,890 |
kW-mo/yr
|
$4.55 |
Natural Gas | $6,738 | 597 |
MMBtu
|
$11.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,510 | $7,490 |
$3,333
38,750
kWh
|
$38
-
kW-mo/yr
|
- | $139 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,876 | $12,800 |
$1,489
17,420
kWh
|
$373
-
kW-mo/yr
|
- | $14 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,424 | $1,000 |
$5,655
65,757
kWh
|
$769
-
kW-mo/yr
|
- | - | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,111 | $14,190 |
$1,111
18,016
kWh
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,865 | $1,000 |
$1,819
21,150
kWh
|
$46
-
kW-mo/yr
|
- | - | |
06 | 2.7423: Reduce heat gain by window tinting | $4,369 | - | - | - |
$4,369
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,573 | $950 |
$4,181
48,618
kWh
|
$1,392
-
kW-mo/yr
|
- | - | |
08 | 2.5194: Redesign process | $513 | $5,280 |
$454
5,281
kWh
|
$59
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $25,241 | $42,710 |
$18,042
214,992
kWh
|
$2,677
-
kW-mo/yr
|
$4,369
-
MMBtu
|
$153 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs