ITAC Assessment: LE0328
ITAC logo
ITAC Assessment: LE0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Switches and Connectors
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 56,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,733 3,132,577
kWh
Electricity Demand $114,952 8,969
kW-mo/yr
Natural Gas $54,729 4,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,447 $60,000 $16,166
209,946
kWh
$5,281
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,435 $12,420 $9,365
121,617
kWh
$3,501
-
kW-mo/yr
- $569
03 2.7232: Replace existing hvac unit with high efficiency model $12,853 $18,000 $942
12,240
kWh
$51
-
kW-mo/yr
$11,860
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,650 $3,000 $5,009
65,055
kWh
$1,641
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,369 $15,675 $4,169
54,142
kWh
$2,038
-
kW-mo/yr
- $162
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,743 $3,000 - $5,743
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,383 $2,500 $216
2,800
kWh
$4,167
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $2,714 $540 $2,714
32,251
kWh
- - -
TOTAL RECOMMENDED $73,594 $115,135 $38,581
498,051
kWh
$22,422
-
kW-mo/yr
$11,860
-
MMBtu
$731
TOTAL IMPLEMENTED $43,690 $51,595 $19,701
255,854
kWh
$11,398
-
kW-mo/yr
$11,860
-
MMBtu
$731
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings