Assessment Year | 1993 |
---|---|
Principal Product | music stands |
NAICS |
n/a
|
SIC | 3792: Travel Trailers and Campers |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
169,000
ft2
|
Annual Production | 3,950
ton
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,946 | 2,163,540 |
kWh
|
$0.078 |
Natural Gas | $17,959 | 5,976 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,092 | $300 |
$10,092
130,129
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,455 | - |
$1,455
18,757
kWh
|
- | |
03 | 2.7492: Use proper thickness of insulation on building envelope | $8,568 | $27,000 | - |
$8,568
-
MMBtu
|
|
04 | 2.3191: Use demand controller or load shedder | $8,390 | $5,850 | - |
$8,390
-
MMBtu
|
|
05 | 2.3132: Recharge batteries on during off-peak demand periods | $264 | - | - |
$264
-
MMBtu
|
|
06 | 2.2711: Utilize outside air instead of conditioned air for drying | $8,376 | $1,543 | - |
$8,376
-
MMBtu
|
|
07 | 2.4133: Use most efficient type of electric motors | $1,828 | $1,740 |
$1,828
23,447
kWh
|
- | |
08 | 2.7135: Install occupancy sensors | $1,072 | $1,530 |
$1,072
13,775
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $978 | $120 |
$978
12,603
kWh
|
- | |
TOTAL RECOMMENDED | $41,023 | $38,083 |
$15,425
198,711
kWh
|
$25,598
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,647 | $36,540 |
$15,425
198,711
kWh
|
$17,222
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs