ITAC Assessment: IA0059
ITAC logo
ITAC Assessment: IA0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product music stands
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 169,000
ft2
Annual Production 3,950
ton
Production Hrs. Annual 4,368
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,946 2,163,540
kWh
Natural Gas $17,959 5,976
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,092 $300 $10,092
130,129
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,455 - $1,455
18,757
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $8,568 $27,000 - $8,568
-
MMBtu
04 2.3191: Use demand controller or load shedder $8,390 $5,850 - $8,390
-
MMBtu
05 2.3132: Recharge batteries on during off-peak demand periods $264 - - $264
-
MMBtu
06 2.2711: Utilize outside air instead of conditioned air for drying $8,376 $1,543 - $8,376
-
MMBtu
07 2.4133: Use most efficient type of electric motors $1,828 $1,740 $1,828
23,447
kWh
-
08 2.7135: Install occupancy sensors $1,072 $1,530 $1,072
13,775
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $978 $120 $978
12,603
kWh
-
TOTAL RECOMMENDED $41,023 $38,083 $15,425
198,711
kWh
$25,598
-
MMBtu
TOTAL IMPLEMENTED $32,647 $36,540 $15,425
198,711
kWh
$17,222
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs