ITAC Assessment: LE0315
ITAC logo
ITAC Assessment: LE0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Frozen Food
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $100
M
to 500
M
# of Employees 329
Plant Area 233,000
ft2
Annual Production 64,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,061,733 18,520,951
kWh
Electricity Demand $516,916 35,132
kW-mo/yr
Natural Gas $323,347 59,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $541,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $404,827 $2,200,000 $957,600
16,800,000
kWh
$353,040
-
kW-mo/yr
$(-905,813.0)
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,359 $25,500 $32,319
567,003
kWh
$16,040
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,842 $2,500 - $25,842
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $22,464 $250 $16,097
282,408
kWh
- $6,367
-
MMBtu
-
05 2.7232: Replace existing hvac unit with high efficiency model $18,864 $50,000 $5,332
93,542
kWh
$2,265
-
kW-mo/yr
$9,267
-
MMBtu
$2,000
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,689 $40 $5,675
99,572
kWh
$2,014
-
kW-mo/yr
- -
07 2.2442: Preheat combustion air with waste heat $6,281 $20,000 - - $6,281
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,370 $2,000 $3,230
56,631
kWh
$2,140
-
kW-mo/yr
- -
09 2.2136: Install / repair insulation on steam lines $1,370 $249 - - $1,370
-
MMBtu
-
TOTAL RECOMMENDED $541,066 $2,300,539 $1,020,253
17,899,156
kWh
$401,341
-
kW-mo/yr
$(-882,528.0)
-
MMBtu
$2,000
TOTAL IMPLEMENTED $42,698 $50,499 $21,429
375,950
kWh
$2,265
-
kW-mo/yr
$17,004
-
MMBtu
$2,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings