Assessment Year | 2008 |
---|---|
Principal Product | Electrical Fittings |
NAICS | 331511: Iron Foundries |
SIC | 3322: Malleable Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
63,600
ft2
|
Annual Production | 3,557
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $373,875 | 5,764,955 |
kWh
|
$0.065 |
Electricity Demand | $129,052 | 21,836 |
kW-mo/yr
|
$5.91 |
Natural Gas | $245,879 | 34,953 |
MMBtu
|
$7.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,061 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $27,859 | $30,000 | - | - | - |
$27,859
-
MMBtu
|
- | - | |
02 | 2.3212: Optimize plant power factor | $13,105 | $26,600 | - | - | $13,105 | - | - | - | |
03 | 2.7496: Install partitions to reduce size of conditioned space | $13,078 | $40 | - | - | - |
$13,078
-
MMBtu
|
- | - | |
04 | 2.4321: Upgrade obsolete equipment | $11,543 | $100,000 | - | - | $(-32,324.0) |
$43,867
-
MMBtu
|
- | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $5,306 | $15,525 |
$4,674
71,904
kWh
|
$632
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,875 | $150 |
$4,148
63,814
kWh
|
$727
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $3,975 | $3,000 | - | - | - | - | $3,975 | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,871 | $3,000 | - |
$3,871
-
kW-mo/yr
|
- | - | - | - | |
09 | 4.812: Apply for investment incentives | $3,632 | $600 | - | - | $3,632 | - | - | - | |
10 | 2.4226: Use / purchase optimum sized compressor | $3,618 | $8,000 |
$3,080
47,388
kWh
|
$538
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,378 | $1,950 |
$2,876
44,242
kWh
|
$502
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.7145: Install skylights | $590 | $5,000 |
$430
6,610
kWh
|
$160
-
kW-mo/yr
|
- | - | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,231 | $29,927 |
$8,535
131,315
kWh
|
$1,495
-
kW-mo/yr
|
- | - | - | $1,201 | |
TOTAL RECOMMENDED | $106,061 | $223,792 |
$23,743
365,273
kWh
|
$7,925
-
kW-mo/yr
|
$(-15,587.0) |
$84,804
-
MMBtu
|
$3,975 | $1,201 | ||
TOTAL IMPLEMENTED | $47,970 | $116,740 |
$10,104
155,444
kWh
|
$5,638
-
kW-mo/yr
|
$(-28,692.0) |
$56,945
-
MMBtu
|
$3,975 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs