ITAC Assessment: LE0273
ITAC logo
ITAC Assessment: LE0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product aircraft power inverter
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 48,500
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,445 1,211,243
kWh
Electricity Demand $41,427 4,133
kW-mo/yr
Natural Gas $29,092 2,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $40,528 $972,000 $40,528
261,986
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,519 $1,440 $9,547
86,010
kWh
$4,972
-
kW-mo/yr
- -
03 2.7233: Use properly designed and sized hvac equipment $11,082 $1,560 $11,082
99,840
kWh
- - -
04 2.9112: Use solar heat to heat water $10,101 $2,730 $10,101
91,000
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $9,907 $214 $6,514
58,687
kWh
$3,393
-
kW-mo/yr
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,118 $6,000 - - - $8,118
-
MMBtu
07 2.7232: Replace existing hvac unit with high efficiency model $4,895 $7,800 $2,877
25,920
kWh
$505
-
kW-mo/yr
- $1,513
-
MMBtu
08 2.3134: Shift from daytime to nighttime operation $4,177 $3,120 - $3,006
-
kW-mo/yr
$1,171 -
09 2.7135: Install occupancy sensors $381 $180 $381
3,432
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $6,813 $42,521 $4,246
38,247
kWh
$2,567
-
kW-mo/yr
- -
TOTAL RECOMMENDED $110,521 $1,037,565 $85,276
665,122
kWh
$14,443
-
kW-mo/yr
$1,171 $9,631
-
MMBtu
TOTAL IMPLEMENTED $26,227 $51,761 $16,670
150,177
kWh
$8,044
-
kW-mo/yr
- $1,513
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs