Assessment Year | 2008 |
---|---|
Principal Product | bottled water |
NAICS | 312112: Bottled Water Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 322 |
Plant Area |
385,000
ft2
|
Annual Production | 454,272,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,613,312 | 70,230,247 |
kWh
|
$0.051 |
Electricity Demand | $823,235 | 117,030 |
kW-mo/yr
|
$7.03 |
Natural Gas | $816,078 | 98,061 |
MMBtu
|
$8.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $390,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $136,305 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $198,263 | $200,000 |
$142,338
2,790,945
kWh
|
$25,266
-
kW-mo/yr
|
- | $30,659 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $41,140 | $6,000 | - |
$41,140
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,169 | $30,000 |
$30,411
596,286
kWh
|
$5,758
-
kW-mo/yr
|
- | - | |
04 | 2.2113: Repair or replace steam traps | $31,944 | $2,000 | - | - |
$31,944
-
MMBtu
|
- | |
05 | 2.2442: Preheat combustion air with waste heat | $21,795 | $30,000 | - | - |
$21,795
-
MMBtu
|
- | |
06 | 2.5195: Change product design to reduce energy requirements | $26,495 | $31,435 |
$22,277
436,800
kWh
|
$4,218
-
kW-mo/yr
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,200 | $3,000 | - | - |
$9,200
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,134 | $1,500 |
$6,720
131,763
kWh
|
$1,414
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,723 | $1,000 |
$3,971
77,870
kWh
|
$752
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,129 | $300,000 |
$11,090
211,411
kWh
|
$2,039
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $390,992 | $604,935 |
$216,807
4,245,075
kWh
|
$80,587
-
kW-mo/yr
|
$62,939
-
MMBtu
|
$30,659 | ||
TOTAL IMPLEMENTED | $136,305 | $342,000 |
$45,472
885,567
kWh
|
$49,689
-
kW-mo/yr
|
$41,144
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs