| Assessment Year | 2008 | 
|---|---|
| Principal Product | bottled water | 
| NAICS | 312112: Bottled Water Manufacturing | 
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters | 
| Sales Range | $50 Mto 100 M | 
| # of Employees | 322 | 
| Plant Area | 385,000 
ft2
 | 
| Annual Production | 454,272,000 
units
 | 
| Production Hrs. Annual | 8,736 
hrs
 | 
| Location (State) | Pennsylvania | 
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,613,312 | 70,230,247 | 
kWh
 | $0.051 | 
| Electricity Demand | $823,235 | 117,030 | 
kW-mo/yr
 | $7.03 | 
| Natural Gas | $816,078 | 98,061 | 
MMBtu
 | $8.32 | 
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $390,992 | See individual recommendations below*Non-energy impacts included in savings. | ||
| IMPLEMENTED SAVINGS* | $136,305 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | 
|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $198,263 | $200,000 | $142,338 2,790,945
                                 
kWh
 | $25,266 -
                                 
kW-mo/yr
 | - | $30,659 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $41,140 | $6,000 | - | $41,140 -
                                 
kW-mo/yr
 | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,169 | $30,000 | $30,411 596,286
                                 
kWh
 | $5,758 -
                                 
kW-mo/yr
 | - | - | |
| 04 | 2.2113: Repair or replace steam traps | $31,944 | $2,000 | - | - | $31,944 -
                                 
MMBtu
 | - | |
| 05 | 2.2442: Preheat combustion air with waste heat | $21,795 | $30,000 | - | - | $21,795 -
                                 
MMBtu
 | - | |
| 06 | 2.5195: Change product design to reduce energy requirements | $26,495 | $31,435 | $22,277 436,800
                                 
kWh
 | $4,218 -
                                 
kW-mo/yr
 | - | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,200 | $3,000 | - | - | $9,200 -
                                 
MMBtu
 | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,134 | $1,500 | $6,720 131,763
                                 
kWh
 | $1,414 -
                                 
kW-mo/yr
 | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,723 | $1,000 | $3,971 77,870
                                 
kWh
 | $752 -
                                 
kW-mo/yr
 | - | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,129 | $300,000 | $11,090 211,411
                                 
kWh
 | $2,039 -
                                 
kW-mo/yr
 | - | - | |
| TOTAL RECOMMENDED | $390,992 | $604,935 | $216,807 4,245,075
                                 
kWh
 | $80,587 -
                                 
kW-mo/yr
 | $62,939 -
                                 
MMBtu
 | $30,659 | ||
| TOTAL IMPLEMENTED | $136,305 | $342,000 | $45,472 885,567
                                 
kWh
 | $49,689 -
                                 
kW-mo/yr
 | $41,144 -
                                 
MMBtu
 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs
             
             
             
            