Assessment Year | 2007 |
---|---|
Principal Product | Semi Conductor Device Wafers |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $100 M to 500M |
# of Employees | 287 |
Plant Area |
500,000
ft2
|
Annual Production | 152,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,638,227 | 59,369,700 |
kWh
|
$0.028 |
Electricity Demand | $626,261 | 98,330 |
kW-mo/yr
|
$6.37 |
Natural Gas | $1,120,233 | 179,182 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $181,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,674 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $81,900 | $65,000 | - | - |
$81,900
-
MMBtu
|
|
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $67,570 | $67,000 |
$51,668
1,845,309
kWh
|
$15,902
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,157 | $20,000 |
$6,215
221,958
kWh
|
$1,942
-
kW-mo/yr
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,686 | $20,000 | - | - |
$7,686
-
MMBtu
|
|
05 | 2.2625: Chill water to the highest temperature possible | $7,471 | $800 |
$5,713
204,019
kWh
|
$1,758
-
kW-mo/yr
|
- | |
06 | 2.6226: Optimize filtration cleaning / replacement to minimize air resistance | $5,988 | $3,000 |
$4,562
162,926
kWh
|
$1,426
-
kW-mo/yr
|
- | |
07 | 2.2611: Moderate cooling tower outlet temperature | $3,029 | $800 |
$2,316
82,716
kWh
|
$713
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $181,801 | $176,600 |
$70,474
2,516,928
kWh
|
$21,741
-
kW-mo/yr
|
$89,586
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,674 | $23,000 |
$4,562
162,926
kWh
|
$1,426
-
kW-mo/yr
|
$7,686
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs