ITAC Assessment: LE0254
ITAC logo
ITAC Assessment: LE0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Semi Conductor Device Wafers
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 287
Plant Area 500,000
ft2
Annual Production 152,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,638,227 59,369,700
kWh
Electricity Demand $626,261 98,330
kW-mo/yr
Natural Gas $1,120,233 179,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $81,900 $65,000 - - $81,900
-
MMBtu
02 2.2614: Use cooling tower or economizer to replace chiller cooling $67,570 $67,000 $51,668
1,845,309
kWh
$15,902
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,157 $20,000 $6,215
221,958
kWh
$1,942
-
kW-mo/yr
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $7,686 $20,000 - - $7,686
-
MMBtu
05 2.2625: Chill water to the highest temperature possible $7,471 $800 $5,713
204,019
kWh
$1,758
-
kW-mo/yr
-
06 2.6226: Optimize filtration cleaning / replacement to minimize air resistance $5,988 $3,000 $4,562
162,926
kWh
$1,426
-
kW-mo/yr
-
07 2.2611: Moderate cooling tower outlet temperature $3,029 $800 $2,316
82,716
kWh
$713
-
kW-mo/yr
-
TOTAL RECOMMENDED $181,801 $176,600 $70,474
2,516,928
kWh
$21,741
-
kW-mo/yr
$89,586
-
MMBtu
TOTAL IMPLEMENTED $13,674 $23,000 $4,562
162,926
kWh
$1,426
-
kW-mo/yr
$7,686
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs