Assessment Year | 2007 |
---|---|
Principal Product | Paper |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2761: Manifold Business Forms |
Sales Range | $10 M to 50M |
# of Employees | 136 |
Plant Area |
114,000
ft2
|
Annual Production | 19,500,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $368,814 | 6,824,400 |
kWh
|
$0.054 |
Electricity Demand | $95,764 | 13,057 |
kW-mo/yr
|
$7.33 |
Natural Gas | $173,396 | 12,543 |
MMBtu
|
$13.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $270,762 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,118 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $116,900 | $500 | - | - |
$116,900
-
MMBtu
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $81,010 | $98,750 |
$46,449
860,160
kWh
|
$8,561
-
kW-mo/yr
|
- | $26,000 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,800 | $8,000 |
$15,836
293,270
kWh
|
$2,964
-
kW-mo/yr
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $9,979 | $35,000 |
$8,545
158,247
kWh
|
$1,434
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,745 | $500 |
$7,374
136,553
kWh
|
$1,371
-
kW-mo/yr
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,473 | $1,500 | - | - |
$1,473
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $3,457 | $375 |
$3,457
64,018
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,398 | $37,677 |
$25,333
469,130
kWh
|
$5,065
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $270,762 | $182,302 |
$106,994
1,981,378
kWh
|
$19,395
-
kW-mo/yr
|
$118,373
-
MMBtu
|
$26,000 | ||
TOTAL IMPLEMENTED | $127,118 | $2,500 |
$7,374
136,553
kWh
|
$1,371
-
kW-mo/yr
|
$118,373
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs