Assessment Year | 2006 |
---|---|
Principal Product | paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
180,000
ft2
|
Annual Production | 20,000
ton
|
Production Hrs. Annual | 6,984
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $504,355 | 12,272,235 |
kWh
|
$0.041 |
Electricity Demand | $243,166 | 25,456 |
kW-mo/yr
|
$9.55 |
Electricity Fees | $22,758 | - |
|
- |
Natural Gas | $87,249 | 7,121 |
MMBtu
|
$12.25 |
Fuel Oil #6 | $1,367,317 | 189,748 |
MMBtu
|
$7.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $531,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,083 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $328,340 | $1,000,000 | - | - | - |
$328,340
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $123,125 | $25,000 | - | - | - |
$123,125
-
MMBtu
|
|
03 | 2.4112: Install soft-start to eliminate nuisance trips | $23,441 | $17,600 | - |
$23,441
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $22,758 | $42,650 | - | - | $22,758 | - | |
05 | 2.4131: Size electric motors for peak operating efficiency | $15,083 | $2,500 |
$10,052
245,179
kWh
|
$5,031
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,063 | $2,750 |
$5,131
125,128
kWh
|
$2,932
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,742 | $300 |
$4,101
100,033
kWh
|
$1,641
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,686 | $300 |
$1,918
46,778
kWh
|
$768
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,309 | $700 |
$1,860
45,380
kWh
|
$449
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $531,547 | $1,091,800 |
$23,062
562,498
kWh
|
$34,262
-
kW-mo/yr
|
$22,758 |
$451,465
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,083 | $2,500 |
$10,052
245,179
kWh
|
$5,031
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs