ITAC Assessment: LE0234
ITAC logo
ITAC Assessment: LE0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Semiconductor equipment material
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 75,600
ft2
Annual Production 0
units
Production Hrs. Annual 7,344
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $948,839 11,170,776
kWh
Electricity Demand $137,133 19,878
kW-mo/yr
Electricity Fees $21,102 -
Natural Gas $297,439 29,553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $300,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $256,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7243: Improve air circulation with destratification fans / other methods $190,924 $500,000 $109,573
1,289,098
kWh
$10,175
-
kW-mo/yr
- - $30,000 $41,176
02 2.2113: Repair or replace steam traps $46,545 $3,000 - - - $46,545
-
MMBtu
- -
03 2.3212: Optimize plant power factor $21,102 $32,700 - - $21,102 - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $22,567 $1,250 - - - $22,567
-
MMBtu
- -
05 2.7496: Install partitions to reduce size of conditioned space $10,090 $6,000 - - - $10,090
-
MMBtu
- -
06 2.7135: Install occupancy sensors $5,320 $1,500 $5,320
62,593
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,195 $3,490 $2,995
35,251
kWh
$200
-
kW-mo/yr
- - - -
08 2.7111: Reduce illumination to minimum necessary levels $593 $60 $524
5,993
kWh
$69
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $300,336 $548,000 $118,412
1,392,935
kWh
$10,444
-
kW-mo/yr
$21,102 $79,202
-
MMBtu
$30,000 $41,176
TOTAL IMPLEMENTED $256,667 $514,050 $118,412
1,392,935
kWh
$10,444
-
kW-mo/yr
- $56,635
-
MMBtu
$30,000 $41,176
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs