ITAC Assessment: LE0209
ITAC logo
ITAC Assessment: LE0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Foam Insulation Panels
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 136,000
ft2
Annual Production 250,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,803 3,204,000
kWh
Electricity Demand $45,216 7,042
kW-mo/yr
Natural Gas $256,022 27,621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $907,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.2314: Replace heat treating oven with more efficient unit $669,800 $350,000 - - - $669,800
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $200,574 $550,000 $162,054
3,001,000
kWh
$38,520
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $18,034 $95 $11,909
220,541
kWh
$6,125
-
kW-mo/yr
- -
04 2.2625: Chill water to the highest temperature possible $10,145 $300 $999
18,562
kWh
- $9,146
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,468 $2,000 - $4,468
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,464 $380 $1,464
21,706
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,643 $1,000 $1,295
23,976
kWh
$348
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $886 $2,140 $76
1,419
kWh
$810
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $842 $148 $713
13,203
kWh
$129
-
kW-mo/yr
- -
TOTAL RECOMMENDED $907,856 $906,063 $178,510
3,300,407
kWh
$50,400
-
kW-mo/yr
$9,146
-
MMBtu
$669,800
TOTAL IMPLEMENTED $25,694 $4,763 $14,162
256,869
kWh
$11,532
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs