Assessment Year 2004
Principal Product Stainless Steel Foodservice Products
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range less than $500
k
# of Employees 567
Plant Area 373,000
ft2
Annual Production 6,864
ton
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,967 6,484,587
kWh
Electricity Demand $154,701 14,362
kW-mo/yr
Natural Gas $62,534 6,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $12,028 $752 $8,312
251,876
kWh
$3,716
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,612 $10,336 - - - $11,612
-
MMBtu
03 2.3212: Optimize plant power factor $9,794 $9,794 - - $9,794 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,437 $300 $2,885
87,439
kWh
$1,552
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $577 - $322
9,776
kWh
$255
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,756 $94,677 $6,577
145,112
kWh
$4,179
-
kW-mo/yr
- -
TOTAL RECOMMENDED $49,204 $115,859 $18,096
494,203
kWh
$9,702
-
kW-mo/yr
$9,794 $11,612
-
MMBtu
TOTAL IMPLEMENTED $5,014 $300 $3,207
97,215
kWh
$1,807
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs