ITAC Assessment: LE0179
ITAC logo
ITAC Assessment: LE0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Heating Appliances
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 117,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,066 1,708,500
kWh
Electricity Demand $35,436 5,106
kW-mo/yr
Natural Gas $13,856 1,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Coal Savings Solid Waste (non-haz) Savings
01 2.7314: Reduce ventilation air $10,362 $942 - - $10,362
-
MMBtu
- -
02 3.5316: Contract a wood pallet recycling company $2,781 - - - - - $2,781
-
lb
03 2.7111: Reduce illumination to minimum necessary levels $1,423 $89 $999
20,808
kWh
$424
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,185 - $1,185
24,695
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $960 $750 - - - $960
-
MMBtu
-
06 2.4314: Use synthetic lubricant $573 $500 $185
3,859
kWh
$388
-
kW-mo/yr
- - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $532 - - $532
-
kW-mo/yr
- - -
08 3.5217: Reuse / recycle/ sell paper products $451 - - - - - $451
-
lb
09 2.2511: Insulate bare equipment $218 $279 - - - $218
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $215 - $170
3,539
kWh
$45
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $18,700 $2,560 $2,539
52,901
kWh
$1,389
-
kW-mo/yr
$10,362
-
MMBtu
$1,178
-
MMBtu
$3,232
-
lb
TOTAL IMPLEMENTED $5,443 $589 $1,354
28,206
kWh
$857
-
kW-mo/yr
- - $3,232
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Coal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs