| Assessment Year | 2003 |
|---|---|
| Principal Product | Steel Wire Rope and Strand |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 479 |
| Plant Area |
600,000
ft2
|
| Annual Production | 24,000
ton
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $980,742 | 20,517,700 |
kWh
|
$0.048 |
| Electricity Demand | $273,211 | 48,034 |
kW-mo/yr
|
$5.69 |
| Natural Gas | $900,672 | 154,953 |
MMBtu
|
$5.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $103,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $37,011 | - | - |
$37,011
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $32,033 | - |
$27,461
574,508
kWh
|
$4,572
-
kW-mo/yr
|
- | - | |
| 03 | 2.8123: Pay utility bills on time | $14,409 | - | - | - | - | $14,409 | |
| 04 | 2.8123: Pay utility bills on time | $10,900 | - | - | - | - | $10,900 | |
| 05 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $6,047 | $10,000 | - | - |
$6,047
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,247 | $750 | - | - |
$2,247
-
MMBtu
|
- | |
| 07 | 2.6218: Turn off equipment when not in use | $1,069 | - |
$1,069
22,362
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $103,716 | $10,750 |
$28,530
596,870
kWh
|
$41,583
-
kW-mo/yr
|
$8,294
-
MMBtu
|
$25,309 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs