ITAC Assessment: LE0156
ITAC logo
ITAC Assessment: LE0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Disposable Medical Devices
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 193
Plant Area 49,521
ft2
Annual Production 200
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,287 4,325,200
kWh
Electricity Demand $65,174 8,120
kW-mo/yr
Natural Gas $231,493 35,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $1,112 $870 $811
12,480
kWh
$301
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $14,320 $750 - - $14,320
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $5,466 - - - $5,466
-
MMBtu
04 2.7124: Make a practice of turning off lights when not needed $2,340 - $2,340
36,000
kWh
- -
05 2.2511: Insulate bare equipment $1,413 - - $1,413
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $844 - $641
9,854
kWh
$203
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $239 $600 $239
3,683
kWh
- -
TOTAL RECOMMENDED $25,734 $2,220 $4,031
62,017
kWh
$1,917
-
kW-mo/yr
$19,786
-
MMBtu
TOTAL IMPLEMENTED $5,104 $1,470 $3,390
52,163
kWh
$1,714
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs