ITAC Assessment: LE0154
ITAC logo
ITAC Assessment: LE0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pre-Painted Sheet Steel
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 50,000
ft2
Annual Production 7,800
ton
Production Hrs. Annual 2,288
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,724 1,079,867
kWh
Electricity Demand $97,665 8,168
kW-mo/yr
Natural Gas $65,300 6,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $658 - $658
8,656
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,185 $300 $3,936
51,796
kWh
$3,249
-
kW-mo/yr
-
03 2.2113: Repair or replace steam traps $3,519 $3,000 - - $3,519
-
MMBtu
04 2.2123: Insulate feedwater tank $363 $183 - - $363
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $5,016 $2,582 - - $5,016
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,485 $750 - - $5,485
-
MMBtu
07 2.7135: Install occupancy sensors $83 $150 $83
1,087
kWh
- -
TOTAL RECOMMENDED $22,309 $6,965 $4,677
61,539
kWh
$3,249
-
kW-mo/yr
$14,383
-
MMBtu
TOTAL IMPLEMENTED $9,662 $3,750 $658
8,656
kWh
- $9,004
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs