ITAC Assessment: LE0148
ITAC logo
ITAC Assessment: LE0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Speacialty Chemicals
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 49,706
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,938 1,382,500
kWh
Electricity Demand $27,764 4,059
kW-mo/yr
Natural Gas $47,265 4,602
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $567 $1,000 $403
4,752
kWh
$164
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $993 - $993
10,998
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,031 $300 $1,333
15,719
kWh
$1,698
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $692 - $497
5,865
kWh
$195
-
kW-mo/yr
- -
05 2.2123: Insulate feedwater tank $121 $260 - - $121
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,804 $535 - - $1,804
-
MMBtu
-
07 3.6192: Use a less expensive method of waste removal $1,390 - - - - $1,390
-
lb
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,496 - - - - $3,496
-
lb
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,033 $750 - - $1,033
-
MMBtu
-
10 2.7111: Reduce illumination to minimum necessary levels $1,308 $990 $1,001
11,806
kWh
$307
-
kW-mo/yr
- -
11 2.7135: Install occupancy sensors $210 $150 $210
2,480
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $4,095 $503
5,928
kWh
$187
-
kW-mo/yr
- -
TOTAL RECOMMENDED $15,335 $8,080 $4,940
57,548
kWh
$2,551
-
kW-mo/yr
$2,958
-
MMBtu
$4,886
-
lb
TOTAL IMPLEMENTED $7,176 $6,395 $3,830
44,451
kWh
$2,192
-
kW-mo/yr
$1,154
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs