Assessment Year | 2002 |
---|---|
Principal Product | Aluminum and Iron Salts |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 47 |
Plant Area |
22,865
ft2
|
Annual Production | 85,000,000
lb
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,388 | 930,500 |
kWh
|
$0.096 |
Electricity Demand | $17,148 | 2,064 |
kW-mo/yr
|
$8.31 |
Fuel Oil #2 | $25,187 | 3,296 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,798 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $6,102 | $390 | - | - |
$6,102
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,467 | - |
$5,467
70,634
kWh
|
- | - | - | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $4,515 | $4,320 | - | - |
$4,515
-
MMBtu
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,573 | $2,500 | - |
$2,573
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,916 | - |
$1,562
20,184
kWh
|
$354
-
kW-mo/yr
|
- | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $1,511 | $500 | - | - |
$1,511
-
MMBtu
|
- | |
07 | 2.4312: Improve lubrication practices | $1,283 | $200 |
$1,107
14,297
kWh
|
$176
-
kW-mo/yr
|
- | - | |
08 | 3.6192: Use a less expensive method of waste removal | $653 | - | - | - | - |
$653
-
lb
|
|
TOTAL RECOMMENDED | $24,020 | $7,910 |
$8,136
105,115
kWh
|
$3,103
-
kW-mo/yr
|
$12,128
-
MMBtu
|
$653
-
lb
|
||
TOTAL IMPLEMENTED | $5,798 | $4,520 |
$1,107
14,297
kWh
|
$176
-
kW-mo/yr
|
$4,515
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs