ITAC Assessment: LE0126
ITAC logo
ITAC Assessment: LE0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum and Iron Salts
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 22,865
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 8,112
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,388 930,500
kWh
Electricity Demand $17,148 2,064
kW-mo/yr
Fuel Oil #2 $25,187 3,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.2136: Install / repair insulation on steam lines $6,102 $390 - - $6,102
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,467 - $5,467
70,634
kWh
- - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $4,515 $4,320 - - $4,515
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,573 $2,500 - $2,573
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,916 - $1,562
20,184
kWh
$354
-
kW-mo/yr
- -
06 2.2414: Use waste heat from hot flue gases to preheat $1,511 $500 - - $1,511
-
MMBtu
-
07 2.4312: Improve lubrication practices $1,283 $200 $1,107
14,297
kWh
$176
-
kW-mo/yr
- -
08 3.6192: Use a less expensive method of waste removal $653 - - - - $653
-
lb
TOTAL RECOMMENDED $24,020 $7,910 $8,136
105,115
kWh
$3,103
-
kW-mo/yr
$12,128
-
MMBtu
$653
-
lb
TOTAL IMPLEMENTED $5,798 $4,520 $1,107
14,297
kWh
$176
-
kW-mo/yr
$4,515
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs