Assessment Year | 2001 |
---|---|
Principal Product | Woven mesh and drawn wire |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $50 M to 100M |
# of Employees | 480 |
Plant Area |
350,000
ft2
|
Annual Production | 5,500,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,002,944 | 17,693,700 |
kWh
|
$0.057 |
Electricity Demand | $300,277 | 33,169 |
kW-mo/yr
|
$9.05 |
Natural Gas | $687,369 | 138,985 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,228 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $43,479 | $7,500 | - |
$43,479
-
kW-mo/yr
|
- | |
02 | 2.1113: Reduce combustion air flow to optimum | $3,995 | $1,000 | - | - |
$3,995
-
MMBtu
|
|
03 | 2.4312: Improve lubrication practices | $13,290 | $800 |
$13,290
332,244
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $22,381 | - |
$16,051
583,916
kWh
|
$6,330
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $2,562 | $200 |
$2,562
64,044
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $12,033 | $18,460 | - | - |
$12,033
-
MMBtu
|
|
TOTAL RECOMMENDED | $97,740 | $27,960 |
$31,903
980,204
kWh
|
$49,809
-
kW-mo/yr
|
$16,028
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,228 | $2,000 |
$31,903
980,204
kWh
|
$6,330
-
kW-mo/yr
|
$3,995
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs