Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Musical Instruments(organ)
NAICS
n/a
SIC 3931: Musical Instruments
Sales Range $10
M
to 50
M
# of Employees 354
Plant Area 325,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,295
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,960 3,622,031
kWh
Electricity Demand $51,709 15,707
kW-mo/yr
Fuel Oil #4 $33,956 4,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,746 $2,500 - $7,746
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,248 - $2,469
36,256
kWh
$779
-
kW-mo/yr
-
03 2.2122: Install / repair insulation on condensate lines $2,738 $3,120 - - $2,738
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $315 $500 - - $315
-
MMBtu
TOTAL RECOMMENDED $14,047 $6,120 $2,469
36,256
kWh
$8,525
-
kW-mo/yr
$3,053
-
MMBtu
TOTAL IMPLEMENTED $6,301 $3,620 $2,469
36,256
kWh
$779
-
kW-mo/yr
$3,053
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs