ITAC Assessment: LE0101
ITAC logo
ITAC Assessment: LE0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Heat treated strip steel
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 132
Plant Area 25,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,135,001 28,008,000
kWh
Electricity Demand $483,781 4,067
kW-mo/yr
Natural Gas $359,614 70,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1113: Reduce combustion air flow to optimum $9,696 $500 - - $9,696
-
MMBtu
-
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $26,225 $30,000 $20,280
394,200
kWh
$5,945
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $78,362 $2,500 - $78,362
-
kW-mo/yr
- -
04 2.4312: Improve lubrication practices $3,752 $800 $3,276
42,573
kWh
$476
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $89,879 - $79,535
908,772
kWh
$10,344
-
kW-mo/yr
- -
06 2.2153: Close off unneeded steam lines $3,984 $2,000 - - - $3,984
07 2.2515: Use optimum thickness insulation $5,167 $2,000 $5,167
67,802
kWh
- - -
TOTAL RECOMMENDED $217,065 $37,800 $108,258
1,413,347
kWh
$95,127
-
kW-mo/yr
$9,696
-
MMBtu
$3,984
TOTAL IMPLEMENTED $217,065 $37,800 $108,258
1,413,347
kWh
$95,127
-
kW-mo/yr
$9,696
-
MMBtu
$3,984
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs