| Assessment Year | 2001 |
|---|---|
| Principal Product | Heat treated strip steel |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 132 |
| Plant Area |
25,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,135,001 | 28,008,000 |
kWh
|
$0.076 |
| Electricity Demand | $483,781 | 4,067 |
kW-mo/yr
|
$118.95 |
| Natural Gas | $359,614 | 70,178 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $217,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $217,065 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1113: Reduce combustion air flow to optimum | $9,696 | $500 | - | - |
$9,696
-
MMBtu
|
- | |
| 02 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $26,225 | $30,000 |
$20,280
394,200
kWh
|
$5,945
-
kW-mo/yr
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $78,362 | $2,500 | - |
$78,362
-
kW-mo/yr
|
- | - | |
| 04 | 2.4312: Improve lubrication practices | $3,752 | $800 |
$3,276
42,573
kWh
|
$476
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $89,879 | - |
$79,535
908,772
kWh
|
$10,344
-
kW-mo/yr
|
- | - | |
| 06 | 2.2153: Close off unneeded steam lines | $3,984 | $2,000 | - | - | - | $3,984 | |
| 07 | 2.2515: Use optimum thickness insulation | $5,167 | $2,000 |
$5,167
67,802
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $217,065 | $37,800 |
$108,258
1,413,347
kWh
|
$95,127
-
kW-mo/yr
|
$9,696
-
MMBtu
|
$3,984 | ||
| TOTAL IMPLEMENTED | $217,065 | $37,800 |
$108,258
1,413,347
kWh
|
$95,127
-
kW-mo/yr
|
$9,696
-
MMBtu
|
$3,984 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs