ITAC Assessment: KU0547
ITAC logo
ITAC Assessment: KU0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product conveyors
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 39,200
ft2
Annual Production 83,000
units
Production Hrs. Annual 2,890
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,967 333,529
kWh
Electricity Demand $6,688 1,196
kW-mo/yr
Natural Gas $7,023 1,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $1,640 $6,670 - - - $1,640
-
MMBtu
- -
02 2.7224: Reduce space conditioning during non-working hours $630 - - - - $630
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $680 $200 - - $680 - - -
04 2.7122: Disconnect ballasts $310 $120 $210
4,103
kWh
$100
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $310 $30 $90
1,758
kWh
$220
-
kW-mo/yr
- - - -
06 3.4151: Minimize water usage $340 $800 - - - - $340
-
Tgal
-
07 2.8114: Change rate schedules or other changes in utility service $4,400 - - - - - - $4,400
08 4.111: Add equipment/ operators to reduce production bottleneck $270 $540 - - - - - $270
TOTAL RECOMMENDED $8,580 $8,360 $300
5,861
kWh
$320
-
kW-mo/yr
$680 $2,270
-
MMBtu
$340
-
Tgal
$4,670
TOTAL IMPLEMENTED $1,310 $200 - - $680 $630
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs