ITAC Assessment: KU0545
ITAC logo
ITAC Assessment: KU0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product power generation equipment
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 129,000
ft2
Annual Production 522,000
units
Production Hrs. Annual 6,552
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,199 3,488,570
kWh
Electricity Demand $96,991 12,262
kW-mo/yr
Natural Gas $13,956 7,452
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3212: Optimize plant power factor $12,740 $4,370 - - $12,740 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,420 $15,470 $3,230
74,736
kWh
$1,310
-
kW-mo/yr
- - - $(-120.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,890 $20 $2,030
43,083
kWh
$860
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,580 $1,150 $1,950
39,273
kWh
$630
-
kW-mo/yr
- - - - -
05 2.2437: Recover waste heat from equipment $1,510 $1,770 - - - $1,510
-
MMBtu
- - -
06 2.8112: Combine utility meters $1,450 $4,000 - $(-6,750.0)
-
kW-mo/yr
$8,200 - - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,020 - $1,020
16,999
kWh
- - - - - -
08 3.1191: Change procedures / equipment / operating conditions $19,600 $11,400 - - - - - - $19,600
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,530 $3,000 - - - - $1,530
-
lb
- -
TOTAL RECOMMENDED $47,740 $41,180 $8,230
174,091
kWh
$(-3,950.0)
-
kW-mo/yr
$20,940 $1,510
-
MMBtu
$1,530
-
lb
$(-120.0) $19,600
TOTAL IMPLEMENTED $26,610 $26,780 $8,230
174,091
kWh
$(-3,950.0)
-
kW-mo/yr
$20,940 $1,510
-
MMBtu
- $(-120.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs