ITAC Assessment: KU0534
ITAC logo
ITAC Assessment: KU0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product hot dogs and sliced meat
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 60,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 7,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,196 8,173,505
kWh
Electricity Demand $115,506 16,590
kW-mo/yr
Natural Gas $198,596 61,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Product Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,860 $1,000 $1,320
-
MMBtu
- $540 -
02 3.4151: Minimize water usage $84,000 $22,000 $38,990
-
MMBtu
$45,010
-
Tgal
- -
03 4.111: Add equipment/ operators to reduce production bottleneck $9,920 $1,360 - - - $9,920
TOTAL RECOMMENDED $95,780 $24,360 $40,310
-
MMBtu
$45,010
-
Tgal
$540 $9,920
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs