ITAC Assessment: KU0528
ITAC logo
ITAC Assessment: KU0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product plastic cabinetry
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 386
Plant Area 88,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,518 5,575,616
kWh
Electricity Demand $115,452 14,464
kW-mo/yr
Natural Gas $37,152 9,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2221: Use immersion heating in tanks, melting pots, etc $37,560 $66,040 n/a $29,560
611,958
kWh
$8,000
-
kW-mo/yr
- - - - -
02 2.8121: Apply for tax-free status for energy purchases $17,330 $800 n/a - - - - $17,330 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,110 $20,590 n/a $5,620
116,354
kWh
$1,520
-
kW-mo/yr
- $(-30.0) - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,290 $920 n/a $3,380
70,047
kWh
$910
-
kW-mo/yr
- - - - -
05 2.2511: Insulate bare equipment $3,690 $4,240 n/a - - $3,690
-
MMBtu
- - - -
06 4.211: Consider use / purchase of bulk materials where possible $16,430 $9,300 n/a - - - - - - $16,430
07 4.125: $6,860 $1,280 n/a - - - - - $6,860 -
08 4.131: Modify process to reduce material use/cost $3,290 $2,800 n/a - - - - - $3,290 -
TOTAL RECOMMENDED $96,560 $105,970 $38,560
798,359
kWh
$10,430
-
kW-mo/yr
$3,690
-
MMBtu
$(-30.0) $17,330 $10,150 $16,430
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs