ITAC Assessment: KU0526
ITAC logo
ITAC Assessment: KU0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product fuel & air filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 162,500
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 3,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,321 4,060,961
kWh
Electricity Demand $56,713 10,849
kW-mo/yr
Natural Gas $80,380 25,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,050 $10,000 $1,360
42,497
kWh
$2,600
-
kW-mo/yr
$(-910.0)
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $1,600 $810 $910
28,136
kWh
$690
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $1,000 - $620
19,343
kWh
$380
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $1,050 $150
4,689
kWh
$50
-
kW-mo/yr
- $500
05 4.441: Install automatic packing equipment $52,280 $151,000 $(-190.0)
(-5,862)
kWh
$(-150.0)
-
kW-mo/yr
- $52,620
TOTAL RECOMMENDED $58,630 $162,860 $2,850
88,803
kWh
$3,570
-
kW-mo/yr
$(-910.0)
-
MMBtu
$53,120
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs