Assessment Year | 1999 |
---|---|
Principal Product | wide-belt sanding machines |
NAICS |
n/a
|
SIC | 3553: Woodworking Machinery |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
98,700
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,781 | 1,259,086 |
kWh
|
$0.036 |
Electricity Demand | $24,050 | 5,168 |
kW-mo/yr
|
$4.65 |
Natural Gas | $23,201 | 4,465 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,920 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,620 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,880 | $4,000 | - |
$5,010
-
kW-mo/yr
|
$870 | - | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $690 | $1,080 |
$150
4,689
kWh
|
$40
-
kW-mo/yr
|
- | - | - | - | $500 | - | - | |
03 | 2.2437: Recover waste heat from equipment | $410 | $670 | - | - | - |
$410
-
MMBtu
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $250 | $250 |
$130
4,103
kWh
|
$120
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $210 | $350 |
$110
3,517
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
06 | 3.5142: Treat and reuse equipment cleaning solutions | $3,440 | $3,630 | - | - | - | - |
$350
-
Tgal
|
$3,090
-
gal
|
- | - | - | |
07 | 4.131: Modify process to reduce material use/cost | $6,720 | $8,000 | - | - | - | - | - | - | - | $6,720 | - | |
08 | 4.131: Modify process to reduce material use/cost | $4,320 | $9,500 | - | - | - | - | - | - | - | - | $4,320 | |
TOTAL RECOMMENDED | $21,920 | $27,480 |
$390
12,309
kWh
|
$5,270
-
kW-mo/yr
|
$870 |
$410
-
MMBtu
|
$350
-
Tgal
|
$3,090
-
gal
|
$500 | $6,720 | $4,320 | ||
TOTAL IMPLEMENTED | $10,620 | $12,230 |
$240
7,620
kWh
|
$220
-
kW-mo/yr
|
- | - |
$350
-
Tgal
|
$3,090
-
gal
|
- | $6,720 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs