ITAC Assessment: KU0485
ITAC logo
ITAC Assessment: KU0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product valves and switches
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area 49,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 3,750
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,394 686,108
kWh
Electricity Demand $9,624 3,300
kW-mo/yr
Natural Gas $2,412 374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,310 $190 $1,140
17,878
kWh
$170
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $560 $660 $230
3,517
kWh
$20
-
kW-mo/yr
- $310 - -
03 2.2511: Insulate bare equipment $470 $300 $470
7,327
kWh
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $230 $40 $200
3,224
kWh
$30
-
kW-mo/yr
- - - -
05 3.4111: Use closed cycle process to minimize waste water production $2,170 $5,260 - - $590
-
Tgal
- $1,580
-
Tgal
-
06 3.4115: Recover and reuse cooling water $1,080 $1,180 - - $460
-
Tgal
- $620
-
Tgal
-
07 3.4155: Meter waste water $230 $100 - - $230
-
Tgal
- - -
08 4.652: Replace existing equipment with more suitable substitutes $128,310 $186,000 - - - - - $128,310
TOTAL RECOMMENDED $134,360 $193,730 $2,040
31,946
kWh
$220
-
kW-mo/yr
$1,280
-
Tgal
$310 $2,200
-
Tgal
$128,310
TOTAL IMPLEMENTED $3,650 $2,430 $1,840
28,722
kWh
$190
-
kW-mo/yr
$690
-
Tgal
$310 $620
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs