Assessment Year | 1997 |
---|---|
Principal Product | corrugated packaging |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 122 |
Plant Area |
196,500
ft2
|
Annual Production | 1,582,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $249,845 | 7,749,707 |
kWh
|
$0.032 |
Electricity Demand | $92,929 | 16,428 |
kW-mo/yr
|
$5.66 |
Natural Gas | $294,483 | 79,826 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,190 | $1,000 | - | - |
$10,190
-
MMBtu
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $9,900 | $17,350 | - | - |
$9,900
-
MMBtu
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $3,580 | $3,500 | - | - |
$3,580
-
MMBtu
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $3,580 | $12,900 |
$2,580
80,305
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,240 | $110 |
$1,630
50,410
kWh
|
$610
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4323: Use optimum size and capacity equipment | $1,780 | $2,200 |
$1,780
55,100
kWh
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | $480 |
$90
2,638
kWh
|
$20
-
kW-mo/yr
|
- | - | $220 | - | |
08 | 3.8314: Purchase high materials in returnable bulk containers | $1,660 | $430 | - | - | - | - | - | $1,660 | |
09 | 3.8132: Use less toxic and volatile solvent substitutes | $1,260 | $1,050 | - | - | - |
$1,430
-
gal
|
- | $(-170.0) | |
TOTAL RECOMMENDED | $34,520 | $39,020 |
$6,080
188,453
kWh
|
$1,630
-
kW-mo/yr
|
$23,670
-
MMBtu
|
$1,430
-
gal
|
$220 | $1,490 | ||
TOTAL IMPLEMENTED | $29,280 | $35,090 |
$6,080
188,453
kWh
|
$1,630
-
kW-mo/yr
|
$20,090
-
MMBtu
|
$1,430
-
gal
|
$220 | $(-170.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs