ITAC Assessment: KU0476
ITAC logo
ITAC Assessment: KU0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product heating elements
NAICS
n/a
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 44,000
ft2
Annual Production 535,000
pieces
Production Hrs. Annual 4,318
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,702 1,230,070
kWh
Electricity Demand $27,783 6,708
kW-mo/yr
Natural Gas $8,625 1,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,340 - $19,620
497,069
kWh
$10,730
-
kW-mo/yr
$(-17,010.0)
-
MMBtu
- - -
02 2.7231: Use radiant heater for spot heating $1,540 $5,580 - - $1,540
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,360 $5,470 $980
24,619
kWh
$380
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,010 $230 $780
19,930
kWh
$230
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $780 $1,400 $780
19,930
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $490 $780 $170
4,396
kWh
$20
-
kW-mo/yr
- - $300 -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $370 $810 $750
19,050
kWh
$90
-
kW-mo/yr
$(-470.0)
-
MMBtu
- - -
08 2.4221: Install compressor air intakes in coolest locations $180 $270 $140
3,517
kWh
$40
-
kW-mo/yr
- - - -
09 3.5221: Recycle casting sand $4,050 - - - - $4,050
-
lb
- -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,340 $300 - - - - - $3,340
11 4.122: Develop standard procedures to improve internal yields $7,620 - - - - - $7,620 -
TOTAL RECOMMENDED $34,080 $14,840 $23,220
588,511
kWh
$11,490
-
kW-mo/yr
$(-15,940.0)
-
MMBtu
$4,050
-
lb
$7,920 $3,340
TOTAL IMPLEMENTED $26,850 $6,270 $21,520
545,135
kWh
$11,380
-
kW-mo/yr
$(-17,010.0)
-
MMBtu
- $7,620 $3,340
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs