ITAC Assessment: KU0473
ITAC logo
ITAC Assessment: KU0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product pneumatic conveying equipment
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 127,500
ft2
Annual Production 1,750
pieces
Production Hrs. Annual 3,995
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,518 1,994,138
kWh
Electricity Demand $25,197 6,276
kW-mo/yr
Natural Gas $26,635 5,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $3,480 $530
21,688
kWh
$490
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $280 $850 $280
11,430
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $220 $100 $150
5,862
kWh
$70
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $450 $80
3,224
kWh
$70
-
kW-mo/yr
- - $80
05 2.7142: Utilize higher efficiency lamps and/or ballasts $200 $360 $50
2,052
kWh
$10
-
kW-mo/yr
- - $140
06 3.1244: Reduce solution drag-out to prevent solution loss $390 $110 - - $340
-
gal
$50
-
lb
-
07 4.711: Initiate a total quality management program $42,770 $9,970 - - - - $42,770
TOTAL RECOMMENDED $45,110 $15,320 $1,090
44,256
kWh
$640
-
kW-mo/yr
$340
-
gal
$50
-
lb
$42,990
TOTAL IMPLEMENTED $2,060 $4,500 $810
32,826
kWh
$640
-
kW-mo/yr
$340
-
gal
$50
-
lb
$220
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs