Assessment Year | 1997 |
---|---|
Principal Product | pneumatic conveying equipment |
NAICS |
n/a
|
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
127,500
ft2
|
Annual Production | 1,750
pieces
|
Production Hrs. Annual | 3,995
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,518 | 1,994,138 |
kWh
|
$0.025 |
Electricity Demand | $25,197 | 6,276 |
kW-mo/yr
|
$4.01 |
Natural Gas | $26,635 | 5,812 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,060 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,020 | $3,480 |
$530
21,688
kWh
|
$490
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $280 | $850 |
$280
11,430
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $220 | $100 |
$150
5,862
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $230 | $450 |
$80
3,224
kWh
|
$70
-
kW-mo/yr
|
- | - | $80 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $200 | $360 |
$50
2,052
kWh
|
$10
-
kW-mo/yr
|
- | - | $140 | |
06 | 3.1244: Reduce solution drag-out to prevent solution loss | $390 | $110 | - | - |
$340
-
gal
|
$50
-
lb
|
- | |
07 | 4.711: Initiate a total quality management program | $42,770 | $9,970 | - | - | - | - | $42,770 | |
TOTAL RECOMMENDED | $45,110 | $15,320 |
$1,090
44,256
kWh
|
$640
-
kW-mo/yr
|
$340
-
gal
|
$50
-
lb
|
$42,990 | ||
TOTAL IMPLEMENTED | $2,060 | $4,500 |
$810
32,826
kWh
|
$640
-
kW-mo/yr
|
$340
-
gal
|
$50
-
lb
|
$220 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs