ITAC Assessment: KU0465
ITAC logo
ITAC Assessment: KU0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Dust Control and Pneumatic Conveying Equipment
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 90,254
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 6,536
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,735 1,640,387
kWh
Electricity Demand $34,922 5,315
kW-mo/yr
Natural Gas $47,761 9,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,907

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.6218: Turn off equipment when not in use $8,543 $80 $10,583
296,600
kWh
- - $(-2,040.0) - -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,536 $15,210 $4,536
127,198
kWh
- - - - -
03 2.7135: Install occupancy sensors $2,887 $1,300 $1,886
52,755
kWh
$1,001
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,188 $9,139 $2,139
59,789
kWh
$1,049
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $1,338 $2,825 $1,048
29,308
kWh
$290
-
kW-mo/yr
- - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,239 $3,500 - - $1,014
-
lb
$(-360.0) - $585
07 2.7142: Utilize higher efficiency lamps and/or ballasts $415 $660 $131
3,810
kWh
$33
-
kW-mo/yr
- $193 $58 -
TOTAL RECOMMENDED $22,146 $32,714 $20,323
569,460
kWh
$2,373
-
kW-mo/yr
$1,014
-
lb
$(-2,207.0) $58 $585
TOTAL IMPLEMENTED $20,907 $29,214 $20,323
569,460
kWh
$2,373
-
kW-mo/yr
- $(-1,847.0) $58 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs