| Assessment Year | 1995 |
|---|---|
| Principal Product | mayonnaise |
| NAICS |
n/a
|
| SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
20,800
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 2,625
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $18,604 | 418,230 |
kWh
|
$0.044 |
| Natural Gas | $1,182 | 246 |
MMBtu
|
$4.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,367 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,367 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,121 | $6,407 |
$1,851
29,308
kWh
|
- | $270 | - | |
| 02 | 2.7135: Install occupancy sensors | $926 | $900 |
$926
14,654
kWh
|
- | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $292 | $408 |
$407
6,448
kWh
|
$(-115.0)
-
MMBtu
|
- | - | |
| 04 | 2.2122: Install / repair insulation on condensate lines | $138 | $217 | - |
$138
-
MMBtu
|
- | - | |
| 05 | 2.2121: Increase amount of condensate returned | $150 | $450 | - |
$101
-
MMBtu
|
- |
$49
-
Tgal
|
|
| 06 | 2.4226: Use / purchase optimum sized compressor | $1,740 | $3,500 |
$1,740
27,550
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $5,367 | $11,882 |
$4,924
77,960
kWh
|
$124
-
MMBtu
|
$270 |
$49
-
Tgal
|
||
| TOTAL IMPLEMENTED | $5,367 | $11,882 |
$4,924
77,960
kWh
|
$124
-
MMBtu
|
$270 |
$49
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs