| Assessment Year | 1995 |
|---|---|
| Principal Product | animal feed |
| NAICS |
n/a
|
| SIC | 2047: Dog and Cat Food |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
89,000
ft2
|
| Annual Production | 135,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $307,411 | 5,323,271 |
kWh
|
$0.058 |
| Natural Gas | $227,830 | 69,438 |
MMBtu
|
$3.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,036 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,076 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $7,483 | $13,216 |
$7,483
130,129
kWh
|
- | - | - | |
| 02 | 2.2136: Install / repair insulation on steam lines | $8,072 | $918 | - |
$8,072
-
MMBtu
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,560 | $300 | - |
$6,560
-
MMBtu
|
- | - | |
| 04 | 3.4155: Meter waste water | $11,589 | $5,000 | - | - |
$11,589
-
Tgal
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,568 | $3,155 |
$1,828
31,653
kWh
|
- | - | $740 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,217 | $2,780 |
$2,744
49,238
kWh
|
- | - | $1,473 | |
| 07 | 2.7135: Install occupancy sensors | $880 | $650 |
$880
15,240
kWh
|
- | - | - | |
| 08 | 2.7132: Install timers on light switches in little used areas | $491 | $90 |
$491
8,499
kWh
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $176 | $240 |
$85
1,465
kWh
|
- | - | $91 | |
| TOTAL RECOMMENDED | $42,036 | $26,349 |
$13,511
236,224
kWh
|
$14,632
-
MMBtu
|
$11,589
-
Tgal
|
$2,304 | ||
| TOTAL IMPLEMENTED | $29,076 | $20,609 |
$12,140
212,485
kWh
|
$14,632
-
MMBtu
|
- | $2,304 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs