| Assessment Year | 1994 |
|---|---|
| Principal Product | Web Presses |
| NAICS |
n/a
|
| SIC | 3555: Printing Trades Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 440 |
| Plant Area |
306,000
ft2
|
| Annual Production | 156
pieces
|
| Production Hrs. Annual | 6,448
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $403,388 | 8,720,985 |
kWh
|
$0.046 |
| Natural Gas | $40,844 | 14,405 |
MMBtu
|
$2.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,959 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,300 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,968 | $75,345 |
$21,968
322,685
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,581 | $1,123 |
$1,581
20,516
kWh
|
- | |
| 03 | 2.7132: Install timers on light switches in little used areas | $1,424 | $150 |
$1,424
30,774
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $312 | $500 |
$312
6,741
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $360 | $540 |
$360
5,862
kWh
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $8,433 | $30,600 |
$8,433
128,370
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $4,061 | $8,050 | - |
$4,061
-
MMBtu
|
|
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,197 | $575 |
$2,197
47,479
kWh
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,993 | $225 |
$1,993
43,083
kWh
|
- | |
| 10 | 2.2514: Cover open tanks | $630 | $1,056 | - |
$630
-
MMBtu
|
|
| TOTAL RECOMMENDED | $42,959 | $118,164 |
$38,268
605,510
kWh
|
$4,691
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,300 | $33,713 |
$16,300
282,825
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs