ITAC Assessment: KU0401
ITAC logo
ITAC Assessment: KU0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product INDUST. LUBRICANTS/OILS
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 3,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,582 549,238
kWh
Natural Gas $35,307 8,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,456 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,876 $3,250 $1,740
18,171
kWh
$15,136
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $575 $1,592 $575
5,862
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $841 - $841
8,792
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $4,685 $6,000 - $4,685
-
MMBtu
-
05 2.1122: Re-size charging openings or add a movable door on equipment $3,768 - - $3,768
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $417 $506 $401
4,103
kWh
- $16
07 2.2511: Insulate bare equipment $154 $165 - $154
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $140 $328 $140
1,465
kWh
- -
TOTAL RECOMMENDED $27,456 $11,841 $3,697
38,393
kWh
$23,743
-
MMBtu
$16
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs