| Assessment Year | 1993 |
|---|---|
| Principal Product | INDUST. LUBRICANTS/OILS |
| NAICS |
n/a
|
| SIC | 2992: Lubricating Oils and Greases |
| Sales Range | $10 M to 50M |
| # of Employees | 54 |
| Plant Area |
n/a
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 3,250
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,582 | 549,238 |
kWh
|
$0.096 |
| Natural Gas | $35,307 | 8,690 |
MMBtu
|
$4.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,456 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,876 | $3,250 |
$1,740
18,171
kWh
|
$15,136
-
MMBtu
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $575 | $1,592 |
$575
5,862
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $841 | - |
$841
8,792
kWh
|
- | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,685 | $6,000 | - |
$4,685
-
MMBtu
|
- | |
| 05 | 2.1122: Re-size charging openings or add a movable door on equipment | $3,768 | - | - |
$3,768
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $417 | $506 |
$401
4,103
kWh
|
- | $16 | |
| 07 | 2.2511: Insulate bare equipment | $154 | $165 | - |
$154
-
MMBtu
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $140 | $328 |
$140
1,465
kWh
|
- | - | |
| TOTAL RECOMMENDED | $27,456 | $11,841 |
$3,697
38,393
kWh
|
$23,743
-
MMBtu
|
$16 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs