ITAC Assessment: KU0303
ITAC logo
ITAC Assessment: KU0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SCIENTIFIC LABRATORY FURNITURE
NAICS
n/a
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,842 449,883
kWh
Natural Gas $34,445 8,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $405 $652 $405
4,689
kWh
- -
02 2.2531: Re-size charging openings or add movable cover or door $2,266 $600 - $2,266
-
MMBtu
-
03 2.1123: Install automatic stack damper $789 $700 - $789
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $374 $750 - $374
-
MMBtu
-
05 3.5314: Use in-process recycling whenever possible $533 $300 - - $533
06 2.8121: Apply for tax-free status for energy purchases $2,397 $400 $1,254
-
kWh
$1,143
-
MMBtu
-
TOTAL RECOMMENDED $6,764 $3,402 $1,659
4,689
kWh
$4,572
-
MMBtu
$533
TOTAL IMPLEMENTED $4,498 $2,802 $1,659
4,689
kWh
$2,306
-
MMBtu
$533
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs