ITAC Assessment: KU0302
ITAC logo
ITAC Assessment: KU0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 316,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,189 910,903
kWh
Natural Gas $6,205 1,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $980 - $980
11,723
kWh
- -
02 2.6214: Shut off pilots in standby equipment $254 - - $319
-
MMBtu
$(-65.0)
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $637 $500 $637
7,620
kWh
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $265 $100 $193
2,345
kWh
$72
-
MMBtu
-
05 2.6121: Reduce hot water temperature to the minimum required $235 $180 - $235
-
MMBtu
-
06 2.7122: Disconnect ballasts $123 $100 $123
1,465
kWh
- -
07 2.8121: Apply for tax-free status for energy purchases $3,210 - $3,210
-
kWh
- -
TOTAL RECOMMENDED $5,704 $880 $5,143
23,153
kWh
$626
-
MMBtu
$(-65.0)
TOTAL IMPLEMENTED $4,802 $280 $4,313
13,188
kWh
$554
-
MMBtu
$(-65.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs