Assessment Year | 1989 |
---|---|
Principal Product | INJECTION MOLDED PARTS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 195 |
Plant Area |
n/a
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,649 | 3,629,836 |
kWh
|
$0.052 |
Natural Gas | $6,413 | 1,545 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,437 | $382 |
$1,437
29,015
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $380 | $76 |
$380
7,620
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,572 | $100 |
$2,572
52,169
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $261 | $300 |
$261
4,982
kWh
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,951 | $3,700 |
$1,951
39,566
kWh
|
- | |
06 | 2.2522: Isolate hot or cold equipment | $1,026 | $1,800 |
$1,026
20,809
kWh
|
- | |
07 | 2.2443: Re-use or recycle hot or cold process exhaust air | $856 | $700 |
$(-49.0)
(-879)
kWh
|
$905
-
MMBtu
|
|
08 | 2.2511: Insulate bare equipment | $727 | $310 |
$727
14,654
kWh
|
- | |
09 | 2.1123: Install automatic stack damper | $531 | $1,020 | - |
$531
-
MMBtu
|
|
10 | 2.6121: Reduce hot water temperature to the minimum required | $361 | - |
$361
7,327
kWh
|
- | |
11 | 2.6121: Reduce hot water temperature to the minimum required | $120 | - |
$120
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $10,222 | $8,388 |
$8,786
177,315
kWh
|
$1,436
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,858 | $1,168 |
$5,858
117,819
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs