Assessment Year | 1989 |
---|---|
Principal Product | PHARMACEUTICALS |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 380 |
Plant Area |
n/a
|
Annual Production | 863,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,798 | 14,225,674 |
kWh
|
$0.034 |
Natural Gas | $82,957 | 35,687 |
MMBtu
|
$2.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,435 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,044 | $2,360 |
$4,044
118,406
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,341 | $2,800 |
$1,341
39,273
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,211 | - |
$1,211
35,463
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,337 | $4,000 |
$10,330
302,462
kWh
|
$(-2,993.0)
-
MMBtu
|
- | |
05 | 3.4157: Replace water cooling on processes with air cooling | $20,380 | $12,500 |
$20,380
596,717
kWh
|
- | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $4,390 | - | - | - | $4,390 | |
07 | 2.8121: Apply for tax-free status for energy purchases | $16,667 | - |
$16,667
-
kWh
|
- | - | |
08 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,513 | $4,000 |
$2,513
73,564
kWh
|
- | - | |
TOTAL RECOMMENDED | $57,883 | $25,660 |
$56,486
1,165,885
kWh
|
$(-2,993.0)
-
MMBtu
|
$4,390 | ||
TOTAL IMPLEMENTED | $24,435 | $6,360 |
$24,435
227,433
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs