ITAC Assessment: KU0290
ITAC logo
ITAC Assessment: KU0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PHARMACEUTICALS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area
n/a
Annual Production 863,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,798 14,225,674
kWh
Natural Gas $82,957 35,687
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,044 $2,360 $4,044
118,406
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,341 $2,800 $1,341
39,273
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,211 - $1,211
35,463
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,337 $4,000 $10,330
302,462
kWh
$(-2,993.0)
-
MMBtu
-
05 3.4157: Replace water cooling on processes with air cooling $20,380 $12,500 $20,380
596,717
kWh
- -
06 3.4156: Use flow control valves on equipment to optimize water use $4,390 - - - $4,390
07 2.8121: Apply for tax-free status for energy purchases $16,667 - $16,667
-
kWh
- -
08 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,513 $4,000 $2,513
73,564
kWh
- -
TOTAL RECOMMENDED $57,883 $25,660 $56,486
1,165,885
kWh
$(-2,993.0)
-
MMBtu
$4,390
TOTAL IMPLEMENTED $24,435 $6,360 $24,435
227,433
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs