ITAC Assessment: KU0287
ITAC logo
ITAC Assessment: KU0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BONELESS HAM
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 16,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,111 3,567,116
kWh
Natural Gas $101,687 29,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $6,331 $4,000 $6,331
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,271 $400 $2,271
43,083
kWh
-
03 2.2621: Modify refrigeration system to operate at a lower pressure $3,214 $4,800 $3,214
60,961
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,735 $2,700 $2,735
51,876
kWh
-
05 2.1222: Install turbulators $3,748 $2,160 - $3,748
-
MMBtu
TOTAL RECOMMENDED $18,299 $14,060 $14,551
155,920
kWh
$3,748
-
MMBtu
TOTAL IMPLEMENTED $2,271 $400 $2,271
43,083
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs