ITAC Assessment: KU0285
ITAC logo
ITAC Assessment: KU0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product POTATO & TORTILLA CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 465
Plant Area
n/a
Annual Production 76,000,000
lb
Production Hrs. Annual 6,840
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $537,759 13,797,480
kWh
Natural Gas $962,501 380,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,382 $1,500 $1,382
35,463
kWh
- -
02 2.5194: Redesign process $6,788 $7,000 - $6,788
-
MMBtu
-
03 2.5121: Redesign flow to minimize mass transfer length $1,165 $2,000 $1,165
29,894
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,527 $24,000 $12,527
321,512
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,478 $22,600 $22,780
584,115
kWh
$(-6,302.0)
-
MMBtu
-
06 2.1123: Install automatic stack damper $3,601 $7,600 - $3,601
-
MMBtu
-
07 2.6121: Reduce hot water temperature to the minimum required $906 $2,500 $891
22,860
kWh
$15
-
MMBtu
-
08 3.4115: Recover and reuse cooling water $16,548 $2,500 - - $16,548
09 2.7226: Use computer programs to optimize hvac performance $10,347 $26,640 $10,347
265,533
kWh
- -
10 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $26,087 $60,000 $26,087
669,109
kWh
- -
11 2.2414: Use waste heat from hot flue gases to preheat $39,539 $50,000 - $39,539
-
MMBtu
-
TOTAL RECOMMENDED $135,368 $206,340 $75,179
1,928,486
kWh
$43,641
-
MMBtu
$16,548
TOTAL IMPLEMENTED $90,981 $110,700 $37,580
963,950
kWh
$36,853
-
MMBtu
$16,548
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs