ITAC Assessment: KU0248
ITAC logo
ITAC Assessment: KU0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BOOTHS, SIGNS & DISPLAYS
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 66,374
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,233 1,796,014
kWh
Natural Gas $78,599 20,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2532: Use only amount of air necessary to prevent explosion hazard $20,271 $2,500 - $19,475
-
MMBtu
$796
02 3.4115: Recover and reuse cooling water $19,728 $9,000 $882
13,189
kWh
- $18,846
03 2.8121: Apply for tax-free status for energy purchases $4,505 - $4,505
-
kWh
- -
04 2.2514: Cover open tanks $2,897 $600 - $2,897
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,471 $150 $2,471
36,928
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,843 $2,961 $1,843
27,550
kWh
- -
07 2.2532: Use only amount of air necessary to prevent explosion hazard $1,435 $267 $137
2,052
kWh
$1,298
-
MMBtu
-
08 2.7224: Reduce space conditioning during non-working hours $988 $14 $353
5,275
kWh
$635
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $608 $40 $608
9,086
kWh
- -
10 2.2136: Install / repair insulation on steam lines $545 $850 - $545
-
MMBtu
-
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $451 $450 $569
8,499
kWh
$(-118.0)
-
MMBtu
-
12 2.4312: Improve lubrication practices $275 - $275
4,103
kWh
- -
13 2.6121: Reduce hot water temperature to the minimum required $176 - $176
2,638
kWh
- -
TOTAL RECOMMENDED $56,193 $16,832 $11,819
109,320
kWh
$24,732
-
MMBtu
$19,642
TOTAL IMPLEMENTED $54,307 $16,115 $11,113
98,769
kWh
$23,552
-
MMBtu
$19,642
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs