ITAC Assessment: KU0233
ITAC logo
ITAC Assessment: KU0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BRONZE BUSHINGS
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,793 2,381,008
kWh
Natural Gas $51,539 13,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $2,808 $5,500 - $2,808
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,637 $2,246 $1,637
32,825
kWh
- -
03 2.4312: Improve lubrication practices $1,038 - $1,038
20,809
kWh
- -
04 2.1123: Install automatic stack damper $678 $400 - $678
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $424 - $424
8,499
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $369 - - $419
-
MMBtu
$(-50.0)
TOTAL RECOMMENDED $6,954 $8,146 $3,099
62,133
kWh
$3,905
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $2,430 $2,246 $2,061
41,324
kWh
$419
-
MMBtu
$(-50.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs