ITAC Assessment: KU0219
ITAC logo
ITAC Assessment: KU0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product JACKETS
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,564 318,875
kWh
Natural Gas $6,183 1,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,778 $2,698 $3,551
48,066
kWh
$(-773.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,013 $3,814 $2,013
27,257
kWh
- -
03 2.7261: Install timers and/or thermostats $1,516 $100 $1,516
20,516
kWh
- -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $498 $1,012 $498
6,741
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $181 $400 - $381
-
MMBtu
$(-200.0)
06 2.1123: Install automatic stack damper $351 $400 - $351
-
MMBtu
-
07 2.6121: Reduce hot water temperature to the minimum required $109 - - $109
-
MMBtu
-
TOTAL RECOMMENDED $7,446 $8,424 $7,578
102,580
kWh
$68
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $5,082 $4,210 $5,565
75,323
kWh
$(-283.0)
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs