| Assessment Year | 1987 |
|---|---|
| Principal Product | JACKETS |
| NAICS |
n/a
|
| SIC | 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $23,564 | 318,875 |
kWh
|
$0.074 |
| Natural Gas | $6,183 | 1,642 |
MMBtu
|
$3.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,082 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,778 | $2,698 |
$3,551
48,066
kWh
|
$(-773.0)
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,013 | $3,814 |
$2,013
27,257
kWh
|
- | - | |
| 03 | 2.7261: Install timers and/or thermostats | $1,516 | $100 |
$1,516
20,516
kWh
|
- | - | |
| 04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $498 | $1,012 |
$498
6,741
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $181 | $400 | - |
$381
-
MMBtu
|
$(-200.0) | |
| 06 | 2.1123: Install automatic stack damper | $351 | $400 | - |
$351
-
MMBtu
|
- | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $109 | - | - |
$109
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $7,446 | $8,424 |
$7,578
102,580
kWh
|
$68
-
MMBtu
|
$(-200.0) | ||
| TOTAL IMPLEMENTED | $5,082 | $4,210 |
$5,565
75,323
kWh
|
$(-283.0)
-
MMBtu
|
$(-200.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs