ITAC Assessment: KU0194
ITAC logo
ITAC Assessment: KU0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product OVERHEAD DOORS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,550
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,275 138,921
kWh
Natural Gas $3,660 800
MMBtu
Other Energy $64,250 8,031
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.8223: Add air shields to trucks to increase fuel mileage $1,687 - - $1,687
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,003 $1,575 $1,003
10,551
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $393 $50 $393
4,103
kWh
-
TOTAL RECOMMENDED $3,083 $1,625 $1,396
14,654
kWh
$1,687
-
MMBtu
TOTAL IMPLEMENTED $3,083 $1,625 $1,396
14,654
kWh
$1,687
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs