ITAC Assessment: KU0192
ITAC logo
ITAC Assessment: KU0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MULTI-WALLED PAPER BAGS
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 24,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,025 3,004,982
kWh
Natural Gas $53,411 12,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,354 $200 $8,354
134,232
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,299 $6,408 $8,299
133,353
kWh
- -
03 2.7229: Air condition only space necessary $2,153 $1,032 - $2,153
-
MMBtu
-
04 2.1123: Install automatic stack damper $1,847 $1,900 - $1,847
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $816 - - $1,316
-
MMBtu
$(-500.0)
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,390 $100 $2,390
-
kWh
- -
07 2.4312: Improve lubrication practices $2,627 $1,700 $2,627
42,204
kWh
- -
08 2.2511: Insulate bare equipment $293 $200 $328
5,275
kWh
$(-35.0)
-
MMBtu
-
09 2.2511: Insulate bare equipment $261 $300 $292
4,689
kWh
$(-31.0)
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $237 - $237
3,810
kWh
- -
TOTAL RECOMMENDED $27,277 $11,840 $22,527
323,563
kWh
$5,250
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $17,207 $7,108 $17,273
277,549
kWh
$(-66.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs