ITAC Assessment: KU0187
ITAC logo
ITAC Assessment: KU0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CONSTRUCTION TOOLS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 130,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,728 260,258
kWh
Natural Gas $18,970 3,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,097 $193 $1,097
11,137
kWh
- -
02 2.1122: Re-size charging openings or add a movable door on equipment $1,550 $2,000 - $1,550
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $218 - - $368
-
MMBtu
$(-150.0)
04 2.1123: Install automatic stack damper $684 $1,200 - $684
-
MMBtu
-
05 2.6214: Shut off pilots in standby equipment $231 - - $281
-
MMBtu
$(-50.0)
06 2.6121: Reduce hot water temperature to the minimum required $136 - $113
1,172
kWh
$23
-
MMBtu
-
TOTAL RECOMMENDED $3,916 $3,393 $1,210
12,309
kWh
$2,906
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $3,232 $2,193 $1,210
12,309
kWh
$2,222
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs