Assessment Year | 1986 |
---|---|
Principal Product | CONSTRUCTION TOOLS |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
n/a
|
Annual Production | 130,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,728 | 260,258 |
kWh
|
$0.099 |
Natural Gas | $18,970 | 3,551 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,916 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,232 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,097 | $193 |
$1,097
11,137
kWh
|
- | - | |
02 | 2.1122: Re-size charging openings or add a movable door on equipment | $1,550 | $2,000 | - |
$1,550
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $218 | - | - |
$368
-
MMBtu
|
$(-150.0) | |
04 | 2.1123: Install automatic stack damper | $684 | $1,200 | - |
$684
-
MMBtu
|
- | |
05 | 2.6214: Shut off pilots in standby equipment | $231 | - | - |
$281
-
MMBtu
|
$(-50.0) | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $136 | - |
$113
1,172
kWh
|
$23
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $3,916 | $3,393 |
$1,210
12,309
kWh
|
$2,906
-
MMBtu
|
$(-200.0) | ||
TOTAL IMPLEMENTED | $3,232 | $2,193 |
$1,210
12,309
kWh
|
$2,222
-
MMBtu
|
$(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs